ESSAY ON: Risk Assessment of Four Nuclear Plant Designs

Number of Pages 17

This research paper: The UK government has given the go-ahead to the building of a new generation of nuclear power stations. Four designs are being assessed; the Areva EPR, Westinghouse AP1000, Candu ACR 1000 and GE ESBWR. This 17 page paper looks at each of these deigns and their safety features, consider the use of probabilistic risk assessment is outline and an event tree is presented for a large lost of coolant event. The bibliography cites 10 sources.


File: TS14_TEnuclearr.rtf


Send me this paper »

« Back to Topic Listings

Copyright © 2000-2025 The Paper Store Enterprises, Inc. & Fast Papers On-line.
All rights reserved. Search for your essay here.

U.S. based premium essay, research and
term papers service since 2000.